07/16/2021 |
|
8:00AM |
10:00AM |
8AM BIENVENIDA Y FORO DE APERTURA: RECONSTRUCCIÓN DEL FUTURO |
|
10:30AM |
12:00PM |
Consideraciones de Diseño, Planificación de Obra de la Reconstrucción del Frente Portuario del Puerto Industrial de Mayaguez Parte 1 |
|
10:30AM |
12:00PM |
Fluctuaciones en Elevación de las Mareas Tidal Datum |
|
10:30AM |
12:00PM |
Freeway Corridor Survelliance Using Unmanned Aircraft Systems |
|
10:30AM |
12:00PM |
Geohazard Design and Construction Innovation and Best Practices |
|
10:30AM |
12:00PM |
New Strategies for Solving the Water Rationing Problem in PR |
|
10:30AM |
12:00PM |
Repair, Restoration and Strenghtening of the Earthquake-dammed Gaddi Baltahak in Nepal |
|
10:30AM |
12:00PM |
Use of Technolgy to Predict Lifespan of Concrete Structures |
|
10:30AM |
12:00PM |
VIRTUAL 1030AM FRP Strenghtening Concrete Structures with Fiber-Reinforced Polymers |
|
10:30AM |
2:00PM |
El Caso del Taxi Lane N del Aeropuerto LMM: Una obra de alto requerimientos técnicos y controles de calidad |
|
12:00PM |
2:00PM |
12PM ALMUERZO Y CHARLA MAGISTRAL |
|
2:00PM |
3:30PM |
Base Isolation and Seismic Dampers for Earthquake Resistance |
|
2:00PM |
3:30PM |
Conceptos Básicos de Geomorfología fluvial y su Aplicación en el Diseño de Estructuras de Estabilización de Ríos |
|
2:00PM |
3:30PM |
Consideraciones de Diseño, Planificación de Obra de la Reconstrucción del Frente Portuario del Puerto Industrial de Mayaguez Parte 2 |
|
2:00PM |
3:30PM |
Construcción Rápida Resistente a Desastres |
|
2:00PM |
3:30PM |
El Futuro de los Marcos de Referencia Vertial and Horizaontal Datums 2022 |
|
2:00PM |
3:30PM |
From Construction Information to Actionable Visibility Boards |
|
2:00PM |
3:30PM |
Performance Measures of Congestion Pricing of the PR 22 Dynamic Toll Facility |
|
2:00PM |
3:30PM |
Sky´s the Limit: The Geotechnical Journey from Site Investigation to Construction in Airport Infrastructure Upgrades |
|
2:00PM |
3:30PM |
VIRTUAL Pavimentos o Estabilización de Taludes |
|
4:00PM |
5:30PM |
Aplicación de Reglamentación y Mapas de Inundación en los Valles Inundables en PR |
|
4:00PM |
5:30PM |
Expedite Construction Work in PR using Micropiles and Helical Piles |
|
4:00PM |
5:30PM |
La Influencia de Albert Einstein en cómo el GPS Mide |
|
4:00PM |
5:30PM |
Lecciones Aprendidas de los Terremotos de Cara al Futuro |
|
4:00PM |
5:30PM |
The Implementation Experiment of the OneBusAway App in Mayaguez |
|
4:00PM |
5:30PM |
Transformation of Educational Facilities Post COVID 19 |
|
4:00PM |
5:30PM |
Urbanismo Sustentable para el Siglo XXI |
|
4:00PM |
5:30PM |
VIRTUAL Proyectos de FEMA: Una Guía Completa de Cómo Manejar los Fondos |
|
4:00PM |
5:30PM |
Wind Loading and Seismic Acceptance Criteria for Roof-mounted PV Arrays |